To Assist SH-MID to Conduct NDT test for all critical component in available identified list, identification of new components co-ordinate and execute coupling alignment activity of critical drives by laser machine. Prepare SAP data report related to PM orders and other notification. Assist and guide for implementing SAP as a power user team member. Ensure thermography schedule compliance.
Job Context & Major ChallengesVikram Cement is located at Jawad in Madhya Pradesh. It has 3 operating lines with the total installed capacity of 2.5 million ton per annum which has been further expanded to 3.0 million ton per annum thro de-bottlenecking of all the three production lines.
Main equipments for Line no.1 and Line No.2 was supplied by M/s KHD Humboldt Wedag Ltd., Germany, M/s Loesche and for Line No.3 by M/s Krupp Polysius, Germany with Roller Press Technology in Pregrinding circuit and high efficiency separator in Raw Mill and Cement Mill. For better control of quality of Input Limestone Gamma Matrix has been installed at Limestone Transport belt.The technical know how and packers are supplied by M/S Haver & Bocker, Germany for line I, II & M/S Enexco for line III, having capacity of 90 TPH, 90 TPH & 180 TPH respectively
Major challenges:
In view of very dynamic scenario with respect to:
•Smooth and trouble free operation of production line by Identification of hidden defect and estimate the fault severity and maintenance planning.
•Minimizing equipment failure and and spare parts cost through intensification of NDT techniques for all critical component in available identified list, identification of new components Co-ordinate and execute coupling alignment activity of critical drives by laser machine
2.NDT job like Ultrasonic Inspection, Thickness Measurement, Magnetic Particle Testing and Thermography etc. of components to identify defects and follow up for corrective action with concerned dept.
3.Lube Sampling and Analysis (WDA) of Critical equipment’s. Identify root cause and follow up for corrective action with concerned department
4.Dynamic Balancing of Critical fans
5.Usage of SAP PM Module like Why-Why report, PM07, Material Reservation, KPI report, PM compliance etc.
6.Planning & Procurement of Spares related to MID.
7.To strengthen the safety by identifying and reporting Unsafe Act / Unsafe Condition, Near Miss in Plant
8.WCM Software Confluence for audits, QCDIP, suggestion and Kaizen, Good to find cases etc.
9.Shutdown monitoring.